From first enquiry to container: how an order with a Chinese exporter actually runs

Most sourcing guides stop at "find a supplier". The order itself — from the first email to the container leaving port — is where timelines and specifications are won or lost. This is the sequence we work through with buyers, written as the checklist to run your own order against, wherever you buy.

簡単に言うと

  • A first enquiry with model numbers, target market and quantity gets an accurate quotation; a "price list please" email gets a catalogue.
  • Compare quotations on a fixed specification annex — LED count, battery capacity, plug standard, packaging — not on the model number alone.
  • Sample approval should end with a sealed golden sample held by both sides, not an email saying the sample is fine.
  • The purchase order annex, not the email thread, is the document production works from: attach the specification, artwork and test requirements to the PO itself.

Stage 1 — the first email

The single biggest accelerator is a specific first message. It needs five elements: the model numbers or the product type, the destination market, the target quantity for the first run, the packaging intent (neutral or retail), and whether you need your brand applied. With those five, a supplier can quote tooling, unit price, MOQ and lead time in one reply. Without them, you get a price list and a week of clarifying emails.

Stage 2 — reading the quotation

A quotation you can compare states the specification next to the price: battery capacity, LED count or motor type, plug standard, packaging version, carton quantity and carton dimensions. If two quotations differ by more than about 10% on the same model number, the difference is almost never efficiency — it is a different battery, a different motor or a different box. Reply by fixing the specification and asking both suppliers to re-quote against it.

Quotation lineWhat it should stateWhy it matters later
Unit priceAgainst a stated specification, EXW or FOB named portThe basis of every later comparison
MOQPer model, per colour, per packaging versionDetermines whether the first order is feasible
ToolingSeparate lines for mould, plug insert, print platesShows what you own and what you pay again later
Lead timeSplit: sample days, production days, booking windowOne total number hides where delays happen
Carton dataQty/ctn, carton size, gross weightYou, not the supplier, pay for the container math
Print this column into your quotation template. Every line left vague becomes a negotiation later.

Stage 3 — sample and golden sample

Ask for a sample pulled from a production batch rather than the sample room, and check it against the specification sheet: count the lit LEDs in a dark room, time a full charge, measure the beam or suction. If the sample passes, seal it. A golden sample — dated, signed by both sides, labelled with the LED count, battery capacity, plug standard, housing colour and packaging version — is the reference that production and any later dispute are measured against. Photos are not a specification.

Stage 4 — the purchase order and its annex

The PO itself is usually short. The annex is where the order is actually defined: the agreed specification, the golden sample reference, artwork files and print proofs, the language of labels and manuals, the test records to be provided, and the packing details. Production teams work from the annex — an instruction that lives only in an email thread three weeks old does not reach the line.

Stage 5 — during production

  • Ask for photos at first-article stage — the first units off the line — while there is still time to correct a colour or a print.
  • Confirm the battery lot: for repeat orders the cell supplier is the component most often substituted between runs.
  • For printed packaging, approve a physical print proof, not a PDF, because colour on screen and colour on corrugate are different materials.

Stage 6 — pre-shipment inspection

The inspection standard should be agreed in the annex: AQL levels, what counts as a defect, and the records to be handed over — incoming battery inspection, 100% function and charging test, carton drop or stacking record, and for lithium products the UN38.3 summary and MSDS for the exact pack. Inspect against the golden sample, with photos of the actual cartons, labels and pallet build.

Stage 7 — booking and documents

Book freight only after the inspection records are in hand. The document set for a typical order is the commercial invoice, packing list, bill of lading, and any certificates your market or carrier requires. Lithium products add the transport documents above; state-of-charge rules for air freight are set by the carrier, not the factory. For repeat orders, re-confirm the specification annex each time — it is cheaper than discovering a substituted component at your warehouse.

For a custom project, a supplier will normally ask for a sample, drawing or 3D file plus the target market and quantity. Ask for tooling, unit price, MOQ and lead time as separate lines in the written quotation.

よくあるご質問

本製品 の主な仕様は?

本製品 の仕様は本ページのパラメータ表に記載しています。プラグ・電圧・容量・梱包はご注文前に書面でご確認ください。

本製品 はロゴ・パッケージのカスタマイズに対応していますか?

はい。既存金型でロゴ印刷・筐体色・パッケージデザイン・マニュアル言語・プラグ規格を指定可能です。構成ごとに MOQ が異なります。

本製品 の MOQ と納期は?

MOQ は機種ごとに、色・プラグ・梱包により変動します。目標数量と仕向地をお知らせいただければ、単価・MOQ・納期を書面でご案内します。

注文前に 本製品 のサンプルを入手できますか?

はい。掲載機種のサンプルをご手配できます。量産前サンプルは書面承認をいただいてから量産に入ります。

本製品 のプラグ・電圧オプションは?

プラグ規格・電圧は市場ごとに設定します(UK・US・AU・EU・ブラジル NBR 14136 など)。お問い合わせ時に仕向国をご指定ください。

本製品 の見積りはどう依頼しますか?

sales@karlead.com に型番・仕向地・プラグ規格・数量をご連絡ください。通常1営業日以内に価格・MOQ・納期・梱包情報をご返信します。

対応可能なプラグ規格と電圧は?

市場に応じて UK・US・AU・EU・ブラジル (NBR 14136)、127V / 220V を指定できます。生産前に構成を確定するため、仕向国をお知らせください。

貴社市場向けのお見積りが必要ですか?

型番・仕向地・プラグ規格をお知らせください。金型費・単価・MOQ・納期をご案内します。

Contact us